Synopsis of Proposals
Below is a synopsis of Lions Gate Crossing proposal submissions. For further information contact the proponents directly; the necessary contact information is on file with Choices Public Information Centre.
Bridges
Double Deck Existing Bridge
Netupsky Engineering Co.ltd.
- Double cable suspension bridge, Tower modifications, (6 lanes)
Current bridge & causeway alignment retained
~$150 million
- -Retains basic appearance of bridge
-Strengthening of foundations
-Modifications to towers, with new cables and stiffening trusses added to the outside of the existing bridge used to carry new upper deck
-Replacement of present deck and stiffening trusses after installation of upper deck.
-Stanley Park causeway to be double decked - either elevated or buried
Double Deck Existing Bridge
Heritage Choice
Paul Merrick Architects Ltd.
- Cable-stayed modification with retention of existing suspension cables (6 lanes)
~$200 million
- -Existing Marine Drive interchange via double-decked structure on existing alignment to Georgia St.
-Second level below ground in Stanley Park
-Traffic maintained during construction
-Existing suspension cables retained as a reflection of their historic symbolism
Twin Bridge
SNC-Lavalin Bridge Group
Squamish Nation
Canron Construction
- Twin Suspension Bridges (2 lanes each bridge)
- -Parallel bridge built alongside existing LGB
-Reconstruct existing bridge for 100-year life
-Improve Stranley Park entrance by tunnel under Lost Lagoon
-Widened causeway through Stanley Park
-Consortium proposing a finance, design, construction and operation package. Cost recovery by tolls.
Refurbish Existing Bridge
H. Mordhost & ALL-SPAN
- Deck replacement scheme (5 or 6 lanes on existing alignment)
Bridge: ~$80 million
Viaduct: ~$20 million
- -Maintain existing towers and general appearance
-Install new cables, hangers, and bridge deck as closely as possible to underside of the existing bridge, remove present deck, then raise new bridge to existing level
-Four lanes beneath existing Stanley Park causeway
-Widen existing North Shore viaduct.
Tunnels
First Narrows Tunnels
Klohn-Crippen Consultants Ltd.
- Tunnel under First Narrows and Stanley Park (2x2 lanes)
~$350 million
- -Twin Bored Tunnels:
- West end of Georgia Street under Stanley Park to Marine Drive Lions Gate Bridge interchange in West Vancouver
- Tunnel driven in rock and soil by tunnel boring machine
- Length each tunnel: ~4,000m
- Lions Gate Bridge could be retained for 2-lane transit plus pedestrians/bicycles
First Narrows 'Zoo' Tunnel
Sandwell Inc.
- Tunnel under First Narrows, Stanley Park & Coal Harbour (6 lanes, including 2 HOV lanes)
$350 - $400 million
- - Marine Drive (Capilano Rd.) to Georgia St. emerging in Devonian Park near Denman St.
- Submerged tunnel in excavated trench across First Narrows
- Cut-and-Cover tunnel under Capilano Rd. through IR#5
- Cut-and-Cover tunnel under Stanley Park on alignment of Lumberman's Arch and existing Zoo road
- Cut-and-Cover tunnel under Coal Harbour
- ~3,000m Tunnel; ~4,000m Overall length
Brockton Point Tunnel
Hans Bentzen & Associates Ltd.
- Tunnel under Burrard Inlet (6 lanes + 2 transit tracks)
$1,200 million
- - Upper Levels to downtown Vancouver (Thurlow area) and bypass tunnels to False Creek bridge heads
- Main crossing to be tunnel in excavated trench
- Bored tunnels beneath downtown Vancouver
- 150 acre island created off Brockton Point from excavated material, 100 acres of which could be developed for commercial / residential land and provide for project funding.
HARBOURlink
Barry Griblin
- Combined road and rail tube tunnel east of Brockton Point
- - Expanded Deadman Island forms peninsula in Coal Harbour for public and private development
- Curved tunnel to North Shore east of Vancouver Wharves - Connection to Capilano Rd.
- Lions Gate Bridge restored to two lanes for buses, tourists, cyclists and pedestrians
- ~2,200m tunnel, ~3,500m overall length
- 4 lane crossing between Coal Harbour's planned thoroughfare and the North Shore low level road corridor with connection to Upper Levels Highway via McGuire Ave. and Capilano Rd.
- Double track rail connection between CP Rail / Skytrain Waterfront Station and BC Rail's Pemberton Terminal
Others
New Double Deck Bridge
Branco Kump
- New 6 lane double deck suspension bridge east of existing Lions Gate Bridge
- - Refurbish existing bridge for light rapid transit
- Double-decked existing causeway through Stanley Park
Restored Double Deck 6-Lane Bridge
Con-Tech Systems Ltd.
- Refurbished double deck suspension bridge
~ $25 million
- - 4 lanes with 2 dedicated to transit
- double-decked causeway through Stanley Park
New Bridge Beside Existing LGB
Fred Fararooni
- New 3 lane bridge east of Lions Gate Bridge
- Expanded causeway through Stanley Park
Gondola Transit
Joel Barrett
- Gondola transit system added to existing / refurbished bridge
- - Gondolas could embark / disembark from Park Royal
- Possible connection to Grouse Mountain
Lions Gate SeaBus Terminal
Ken Higgs
- New SeaBus terminal 150m east of the Lions Gate Bridge
~$25 million
- Lions Gate Bridge to be refurbished and remain at 3 lanes
Tunnel in First Narrows
Don Gillis
- Tunnel from North Shore to Lost Lagoon (2x2 light traffic lanes)
~$92 million
- - Twin tunnels crossing First Narrows in an excavated trench from the Rose Garden to the North Shore
- Use of circular profile and skidway for tunnel units which are constructed 'in the dry'
- Tunnel under Rose Garden / Stanley Park
- Lions Gate Bridge to be restored to two lanes for cyclists and pedestrians.
Light Rail Transit
Transport 2000
- Light Rail Transit on refurbished existing bridge or in mid-harbour tunnel.
- - Transit rail line from Burrard Street to Pemberton Ave.
- Mid-harbour tunnel allows for restoration of Lions Gate Bridge to 3 lanes of traffic.
Light Rail Rapid Transit
Gwyer Webber
- a) Single bored tunnel on Brockton alignment
~ $175 million
-or-
b) New First Narrows Bridge
~$400 million
- a) Bored tunnel from Burrard St. to Park Royal in West Vancouver
Existing bridge upgraded for vehicles
- b)5 lane bridge with 2 lanes for LRRT
Lions Gate Transit Bridge / Tunnel
Nicholas Heap
- First Narrows tunnel and refurbished Lions Gate Bridge for transit.
- - 4-lane tunnel with tolls
- 2 lanes for transit through causeway
SkyRail
Linda Mueller
- Vehicle and passenger transit link across First Narrows Bridge (new or refurbished)
- - Double deck bridge
- Tunnel under existing causeway
- dual vehicle and passenger system
- Possible extension to Burrard St. Bridge and beyond..
Burrard Tunnel & Refurbished Bridge
Vimarc Consultant Services Inc.
- 4-lane sectional immersed tube and refurbished bridge
$380 - $450 million
- - Lonsdale to Clark Drive
- 25 metre depth
- Short bored or cut and cover tunnels on each side of Burrard Inlet
Choices last revision 95.09.18.